摘要
目前,软件过程度量理论和方法还不够完善,而高效准确的过程定量管理是成功进行软件过程改进的保障,为此提出了一种结合层次分析(AHP)算法和统计过程控制(SPC)的软件过程度量新方法。方法遵循集成能力成熟度模型(CMMI)构架,从软件过程角度对软件项目进行度量。最后以实例证明本方法能有效支持软件过程的度量与改进。
The research of software process measurement is an important and difficult field. At present, the theories and means of software process measurement still need to be improved, and highly efficient and accurate process quantity management can ensure the success of software process improvement. Therefore, a new means integrating Analytical Hierarchy Process(AHP) with Statistic Process Control(SPC) was put forward in this paper. On the basis of Capability Maturity Model Integrated(CMMI), software project was measured from the perspective of software process. At last a case study demonstrates that this means can support software process measurement and improvement effectively.
出处
《计算机应用》
CSCD
北大核心
2006年第10期2476-2479,共4页
journal of Computer Applications
关键词
集成能力成熟度模型
软件度量
层次分析算法
统计过程控制
Capability Maturity Model Integrated (CMMI)
software metric
Analytical Hierarchy Process( AHP)
Statistic Process Control(SPC)