摘要
新建污雨水管道与已建管道交叉时,往往出现高程冲突,文章以工程实例来说明溢流堰在管道交叉处理中的应用,为解决污雨水管道高程冲突提供了一个新方法。
When laying a new wastewater or rainwater pipeline crossing with the old ones, the altitude conflict often appears. A project instance is used to explain the application of the oveffam weir in crossing pipelines. A new way is proposed to solve the conflict of sewage pipeline.
出处
《平顶山工学院学报》
2006年第4期30-31,45,共3页
Journal of Pingdingshan Institute of Technology
关键词
溢流堰
倒虹吸
管道交叉
overfall weir
inverted siphon tube
pipeline crossing