摘要
位于英国Barnard城堡的葛兰素史克制药公司,最新研制出能有效削减成本高达20%的热水供应方法,作为其降低能量消耗的战略性步骤之一。葛兰素史克全厂占地面积25万平方米,专门从事于药片、药剂、药膏以及无菌液体注射剂等医药产品的生产。
Anew water heating method has helped cut costs by 20 per cent at GlaxoSmithKline (GSK)'s factory at Barnard ,Castle in the UK as part of the pharmaceutical company's campaign to reduce energy consumption. GSK manufactures tablets, creams, ointments and sterile liquids for injection at the 25 hectare site.