摘要
对原淮北选煤厂单号跳汰生产的现状进行了分析,提出了改进措施,并对实施后的效果进行了分析。
This paper makes an analysis on the state of jigging in Huaibei Coal Preparation Plant. Some measures are put forward and the effect in practice is analyzed.
出处
《煤炭技术》
CAS
2006年第9期91-92,共2页
Coal Technology
关键词
系统管理
技术更新
效果
system management
technology renovation
effect