摘要
大同客车车辆分段南北车库对接工程处于地震带之上,设计时考虑了结构设计、抗震分析、构造处理、经济效益等四个方面,取得了良好的效果。
The butt joint of north-south garage in Datong Passenger Transport Station lies in earthquake zone. E.ngineers make a design from structure design, seismic analysis, structure treatment, and economic benefit. The effect of construction is good.
出处
《施工技术》
CAS
北大核心
2006年第8期46-47,72,共3页
Construction Technology
关键词
车库
对接工程
设计
抗震分析
garage
butt joint project
design
seismic analysis