简要介绍了地下室结构逆作法施工的流程、节点的处理以及施工过程中的质量控制和要求,并对逆作法施工的经济效益和工期控制进行了分析对比,以达到节约费用、保证地下室施工质量的目的。
The following paper introduces the process and node treatment of basement structural reverse construction method and quality control and requirement in its construction process, and analyzes and compares the economic benefits and work-time control of reverse construction method, in order to ensure the construction quality of basement and to save cost.
出处
《山西建筑》
2006年第17期121-121,共1页
Shanxi Architecture
关键词
地下室
施工流程
质量控制
basement, construction process, quality control