摘要
结合工程实例,介绍了斜拉大桥塔梁混凝土应力监测与控制的过程.保证了斜拉桥在施工过程中的受力和变形状态始终处于设计所要求的安全范围。
Combined with practical engineering, the author introduces monitoring and control process of cable-stayed bridge tower beam concrete stress to ensure the force balance and deformation state of cable-stayed bridge are always in the safe scope of design requirement in construction process.
出处
《山西建筑》
2006年第16期263-264,共2页
Shanxi Architecture
关键词
塔梁混凝土
应力监测
温度监测
斜拉桥
tower beam concrete, stress monitoring, temperature monitoring, cable-stayed bridge