摘要
The construction of a 10-Mt/a oil refining and 1.0 Mt/a ethylene project at PetroChina Dushanzi Petrochemical Company (DPC) was kicked off in August 2005. This project includes 20 petroleum refining units and 12 chemical units with the budgeted investment amounting to 26.2 billion RMB. The construction of refining units is expected to be finished in 2007, while the construction of chemical units is slated for completion in 2008. After commissioning of the process units a production capacity of 5.5 Mt/a of finished petroleum products and 1.82 Mt/a of chemical products will be formed.