摘要
结合工程实例,介绍了预应力梁的施工顺序、模板的安装与拆除及其张拉工艺,详细阐述了钢筋绑扎过程中需注意的问题,并对预应力筋的下料与穿束要求进行说明,以供其他类似工程参考借鉴。
Ccmbined with project examples, it introduces the construction order of prestressed beam, erection and removal of the forms and the stretch-draw technique of those forms. It represents the problems that should be noticed in the concrete reinforcement bar binding in detail and explains the baiting and binding requests of prestressed bar. This will provide reference for the similar projects.
出处
《山西建筑》
2006年第15期113-114,共2页
Shanxi Architecture
关键词
预应力梁
张拉工艺
施工过程
prestressed beam, stretch-draw technique, construction process