摘要
北京西客站主站区建筑面积约50万m^2。现场绑扎钢筋10万多吨,粗钢筋接头80多万个。本文对该工程应用的多种新型钢筋接头工艺扼要进行了介绍,可供有关专业人员参考。
The building area is about 500, 000 square metres in the main quarter of Beijing West Railway Station. More than 100, 000 tons of reinforcements with 800, 000 pieces of jounts were worked in the job site.This paper presents briefly the technical principles of various new reinforcement joints used in this work, which will be available for reference.