水库并联供水方式水电站大波动水力过渡过程工况的拟定 被引量:1

Operating Condition about Great Fluctuation Transient Process in Hydropower Station with Two Parallel Reservoirs
下载PDF
导出
摘要 基于工况拟定的目的,以及常规供水方式水电站工况拟定的一般原则,通过对二个水库并联供水方式水电站的特殊性的研究,得出了拟定二水库并联供水方式水电站大波动水力过渡过程工况的程序和方法。 Based on the purpose of operating condition drawn up,and general principle of the conventional water supply hydropower station operating condition drawn up and through research of the particularity of hydropower station with two Parallel reserviors, we obtained the general drawing up procedure and method of hydropower station with two parallel reservoirs great fluctuation water power transient process operating condition.
出处 《石河子大学学报(自然科学版)》 CAS 2006年第3期339-342,共4页 Journal of Shihezi University(Natural Science)
关键词 并联水库 过渡过程 工况 the parallel reservoirs transient process operating condition
  • 相关文献

参考文献3

  • 1吴荣樵,陈鉴治编..水电站水力过渡过程[M].北京:中国水利水电出版社,1997:111.
  • 2马善定,汪如泽主编..水电站建筑物[M].北京:中国水利水电出版社,1982:264.
  • 3刘启钊,彭守拙编..水电站调压室[M].北京:水利电力出版社,1995:214.

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部