摘要
基于工况拟定的目的,以及常规供水方式水电站工况拟定的一般原则,通过对二个水库并联供水方式水电站的特殊性的研究,得出了拟定二水库并联供水方式水电站大波动水力过渡过程工况的程序和方法。
Based on the purpose of operating condition drawn up,and general principle of the conventional water supply hydropower station operating condition drawn up and through research of the particularity of hydropower station with two Parallel reserviors, we obtained the general drawing up procedure and method of hydropower station with two parallel reservoirs great fluctuation water power transient process operating condition.
出处
《石河子大学学报(自然科学版)》
CAS
2006年第3期339-342,共4页
Journal of Shihezi University(Natural Science)
关键词
并联水库
过渡过程
工况
the parallel reservoirs
transient process
operating condition