摘要
瀑布沟水电站工程规模巨大,工程技术难度大,为此,开展了一系列的科技攻关和研究工作。对深厚覆盖层防渗墙接头型式,利用宽级配砾石土作为心墙堆石坝防渗体,大坝抗裂措施,泄洪消能雾化,厂区地下洞室群布置及围岩支护,金属结构及机电设备等关键技术开展了深入的研究,取得了丰硕成果,为瀑布沟水电站工程的顺利建设奠定了坚实基础。
A series of researches on key scientific and technical problems and studies are carried out due to huge size and difficult engineering problems of Pubugou hydropower project.Studies are conducted further with respect to joint pattern of diaphragm wall in deep overburden,broad gradation gravel soil used as impervious material in rockfill dam with core,dam crack prevention measures,atomization during flood discharge and energy dissipation,arrangement of underground powerhouse complex and surrounding rock support,metal structures,electrical and mechanical equipment.Great achievement is gained to provide sound foundation for construction of Pubugou hydropower project.
出处
《四川水力发电》
2006年第3期8-11,共4页
Sichuan Hydropower
关键词
瀑布沟水电站
枢纽工程
关键技术
研究
成果
Pubugou hydropower station
project
key technology
research
achievement