摘要
结合工程实例,介绍了钟鼓山及万石山隧道的施工总体方案,着重探讨了隧道洞内立交部分的施工工艺,确保了隧道施工安全及结构安全,为类似工程提供了施工经验。
Combined with practical engineering, the author introduces the overall construction program of Zhonggu Mountain and Wanshi Mountain tunnel, mainly discusses the construction technique of tunnel interchange construction, which to ensure the construction safety and structural safety of the tunnel and to provide construction experiences for similar project.
出处
《山西建筑》
2006年第14期289-290,共2页
Shanxi Architecture
关键词
施工方法
隧道改造
超大断面
立交下穿段
construction method, tunnel transformation, mega-section, underpass section of interchange