期刊文献+

榆林沟既成坝系加固配套初步研究

Preliminary Study on Reinforcement and Complement of Yulingou Accoplished Dam System
下载PDF
导出
摘要 榆林沟既成坝系加固配套初步研究刘立斌,徐乃民,卢照辉,马生祥(黄委会绥德水土保持科学试验站,陕西绥德718000)雷元静(黄委会宣传出版中心)PreliminaryStudyonReinforcementandComplementofYulingou... Yulingou, with an area of 65. 6km2, is a tributary of middle Wudinghe River. By the end of 1992, the watershed totally preserved 121 silt-arresters with total storage of 33. 03 million m3,which includs 14 key gully control project, the ratio of key gully control projects to dams is 1: 7. 6.For lack of strict mechanism for dam system mangement and developing unreasonably in a long term, the dam projects were silted and destroyed severely. the majority of silt-arresters became danger, the flood prevention ability of dam system decreased greatly, the utilization ratio for production of land behind silt-arresters reduced. According to situation, existing problems,gully features, social & economic conditions of dam system, the paper puts forward two plans of reinforcement and complement and optimizes one through comparative analysis, that is to reinforce and complete 72 dams on the basis of original dam system, which includes 23 new built dams, the ratio of key gully control projects to dams is 1: 6. 9, the flood prevention standard of the watershed iS 200-year rainfall standard, the area of silted land is added up to 359. 9 hm2. The total investment for these projects is 1166 thousand yuan.
出处 《中国水土保持》 北大核心 1996年第11期28-31,共4页 Soil and Water Conservation in China
关键词 榆林沟 水土保持 综合治理 淤地坝 accoplished dam system reinforcement and complement silt-arrester plan Yulingou
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部