摘要
某尾矿库位于较为典型的岩溶地区,曾发生尾矿水渗漏造成环境污染,经采取垂直帷幕灌浆为主,辅以防渗铺盖、防渗堤坝的直接工程措施和对库内尾水进行回收利用、控制外排的综合治理措施,库水的渗漏得到了有效的遏止,防渗工程项目顺利通过环境检测验收。
A tailings reservoir located in a typical Karst area once oozed and led to environmental pollution. Vertical curtain grouting method, assisted with direct engineering measures of seepage-proof covering and damming, was adopted to control the draining and reutilize the tail water. The seepage was held back effectively. The work of seepage-proof has been checked and accepted successfully by environmental organizations.
出处
《昆明冶金高等专科学校学报》
CAS
2006年第3期6-10,共5页
Journal of Kunming Metallurgy College
关键词
岩溶
尾矿库
渗漏
垂直帷幕灌浆
防渗铺盖
Karst
tailings reservoir
seepage
vertical curtain grouting
seepage-proof covering