西藏直孔水电站深厚覆盖层坝基防渗墙施工 被引量:7

Construction Technology for Cut-off Wall in Deep Alluvium of Zhikong Power Station Foundation in Tibet
下载PDF
导出
摘要 西藏直孔水电站防渗墙(墙体最深达到79 m)建造在青藏高原深覆盖层中,自然条件恶劣,地质条件复杂,给造孔成槽带来极大困难。施工中根据地层的不同特点,分别采用了钻抓法、钻劈法、纯抓法等多种造孔工艺,较好地解决了造孔过程中遇到的各种问题,造孔工效在同类地层中达到较好水平。 The cut-off wall (with the maximum wall depth of 79 m) for the Zhikong Hydropower Station in Tibet is constructed in the deep alluvium of Qinghai-Tibet Plateau with poor natural conditions and complex geological conditions, so that it is very difficult to drill a hole for trench. In the construction, many methods such as drilling-clawing, drilling-splitting and pure clawing have been used in the forming of hole, according to the different characteristics of stratum, which solves the various problems encountered in the forming of hole so that its working efficiency is good.
出处 《水力发电》 北大核心 2006年第5期37-39,共3页 Water Power
关键词 深厚覆盖层 防渗墙 施工技术 西藏直孔水电站 deep alluvium cut-off wall construction technology Zhikong power Station in Tibet
  • 相关文献

同被引文献34

引证文献7

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部