大体积泵送混凝土施工技术 被引量:13

Mass Pumped Concrete Construction Technique
下载PDF
导出
摘要 介绍了宜万铁路龙王庙特大桥12#墩(墩高106.5m)承台混凝土施工技术。通过严格控制混凝土温度、降低内外温差、预防收缩裂缝,在地形复杂条件下,严密组织,减少坍落度损失、延缓凝结时间,确保了顺利泵送和浇注质量,取得了较好的效果。 This paper Introduces the concrete construction technique for the cushion cap of No. 12 pier (with the height of 106.5 m) Longwangmiao Extra-long Span Bridge on Yiwan Railway. Through controlling the temperature of the concrete strictly, lowering the difference between the internal temperature and external temperature, preventing the shrinkage cracks, and under the complex topographic conditions, tightening the organization, reducing the loss of the slump constant, and delaying the time of setting, the smoothness of the concrete pumping and the pouring quality have been guaranteed, and the good results have been obtained.
作者 于建华
出处 《科技情报开发与经济》 2006年第7期296-296,F0003,共2页 Sci-Tech Information Development & Economy
关键词 大体积混凝土 泵送混凝土 施工技术 mass concrete pumped concrete construction technique
  • 相关文献

同被引文献24

引证文献13

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部