摘要
对管片模具的方案设计进行了比选,介绍了管片模具的主要结构设计和工作流程。
This paper makes comparison between various moulds designs for lining segment and presents the main structure of the moulds and the work flow in which they are used.
出处
《现代城市轨道交通》
2006年第2期28-30,33,共4页
Modern Urban Transit