摘要
东莞玉兰大剧院工程采用了复杂的螺旋体钢桁架-混凝土主体结构,混凝土和钢结构相交关系复杂,施工难度大,施工中创新地应用了多种支模方法和综合应用了直吊、抬吊、滑移、牵拉等钢结构安装方法,解决了复杂施工环境中混凝土结构和钢结构相互交叉施工的难题。
The complicated leptospira steel truss concrete structure was applied to main body structure of Dongguan Yulan Opern. The interrelation between concrete structure and steel structure is complex. Multiformwork method and steel structure installation method were applied to put the axe in the helve in concrete structure and steel structure cross construction at complicated construction conditions.
出处
《施工技术》
CAS
北大核心
2006年第4期8-13,共6页
Construction Technology