5Yi He,Goran Anderson,Ron N.Allan.Determining optimum location and number of automatic switching device in distribution systems[C].IEEE Power Tech'99 Conference,1999,Hungary. 被引量:1
6Levitin G,Mazal-Tov S,Elmakis D.Optimal allocation of sectionalizer in radial distribution networks[C].Proceeding of the 1995 Stockholm Power Tech Conference,761-764. 被引量:1
7Jen-Hao Teng,Chan-Nan Lu.Feeder-switch relocation for customer interruption cost minimization[J].IEEE trans.On power Delivery,2002,17(1):254-259. 被引量:1
9P.Wang,R.Billinton.Demand-side optimal section of switching device in radial distribution system planning[J].Proceeding of IEE G.T.D,1998,195(4):409-414. 被引量:1
4Allan R N, Billinton R, Sjarief I, et al. A reliability test system for educational purposes-basic distribution system data and results[J]. IEEE Trans. on Power Systems, 1991, 6(2): 813-820. 被引量:1
5Billinton R, Jonnavithula S. A test system for teaching overall power system reliability assessment[J]. IEEE Trans. on Power Systems, 1996, 11(4): 1670-1676. 被引量:1
6Billinton R, Kumar S, Chowdhury N, et al. A reliability test system for educational purposes-basic data[J]. IEEE Trans. on Power Systems, 1989, 4(3): 1238-1244. 被引量:1
7Billinton R, Wang P. Reliability Network Equivalent Approach to Distribution-system-reliability Evaluation. IEE Proceeding-C, 1998, 145(2): 149-153. 被引量:1
8Billinton R, Jonnavithhula S. A Test System for Teaching Overall Power System Reliability Assessment. IEEE Trans on Power Systems, 1996, 11(4): 1670-1676. 被引量:1
9Jonnavithula S, Billinton R. Minimum Cost Analysis of Feeder Routing in Distribution System Planning. IEEE Trans on Power Delivery, 1996, 11(4): 1935-1940. 被引量:1
10Wang P, Billinton R. Optimal Load-shedding Technique to Reduce the Total Customer Interruption Cost in a Distribution System. IEE Proceeding-C, 2000, 147(1):51-56. 被引量:1
6TENG Jenhao, LU Channan. Feeder-switch relocation for customer interruption cost minimization [ J ]. IEEE trans, on Power Delivery ,2002,17 ( 1 ) :254-259. 被引量:1
7PARK Y M, LEE K H. Application of expert system to power system restoration on local control center [J ]. Electrical Power & Energy Systems, 1995,17 (6) :407-415. 被引量:1