摘要 以张家洼铁矿-250m中段矿体赋存条件为背景,进行了无底柱分段崩落法不同结构参数的放矿模拟试验.引入灰色局势决策理论,成功地将回收率、纯矿石回收率、岩石混入率等多目标优化问题转化为单目标优化问题.根据试验结果,采用灰色决策方法得出了张家洼铁矿-250m中段无底柱分段崩落法的最佳结构参数为分段高度12.5m,进路间距12m,放矿步距4~5m.研究结果为矿山采准设计提供了依据,研究方法为采矿工程的优化拓宽了途径. Taking the conditions of the medium ore body of - 250 m phase in Zhangjiawa Iron Mine as background, a simulating experiment was carried out with different constructional parameters for non-pillar sublevel caving. Introducing the grey decision-making theory in the optimization of constructional parameters, the problem to transform multi-object optimization including the rates of ore recovery, undiluted ore recovery and rock drop-in into a single-object optimization was successfully solved. According to the experimental results, it was found that such optimum constructional parameters as sublevel height, drift interval and drawing pace are 12.5 m, 12 m and 4-5 m, respectively, for the non-pillar sublevel caving of the medium - 250 m phase. The investigation provides not only a foundation on which the design of mining preparation is available but also a new approach to the optimization of mining engineering.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2006年第4期454-457,共4页 Journal of Northeastern University(Natural Science)
基金 国家'十五'科技攻关项目(2001BA609A-10)
关键词 无底柱 分段崩落法 结构参数 灰色决策 张家洼铁矿 non-pillar sublevel caving structure parameter grey decision-making Zhangjiawa Iron Mine
  • 相关文献

参考文献11

  • 1邓聚龙著..灰色系统理论教程[M].武汉:华中理工大学出版社,1990:428.
  • 2李孜军.1992-2001年我国灰色系统理论应用研究进展[J].系统工程,2003,21(5):8-12. 被引量:39
  • 3Ning D T,Wang L.Grey development decision on energy-economy-environmental system[A].Proceedings of Sino-German Symposium on Energy and Environment[C].Beijing:China Environmental Sciences Press,1994.31-46. 被引量:1
  • 4Liu S F,Liu Y.An introduction to grey systems:slippery rock[M].Beijing:IIGSS Academic Publisher,1998.40-77. 被引量:1
  • 5张国联,邱景平,宋守志.小官庄铁矿生产矿块结构参数的试验分析[J].东北大学学报(自然科学版),2003,24(11):1092-1095. 被引量:7
  • 6Wittke W,Pierau B.Foundations for the design and construction of tunnel in swelling rock[A].Proceedings of the 4th International Congress on Rock Mechanics[C].Montreux:AIME,1979.216-219. 被引量:1
  • 7Singh S P.Burst energy release index[J].Rock Mechanics and Rock Engineering,1988,21(1):149-155. 被引量:1
  • 8唐春安,刘红元,秦四清,杨志法.非均匀性对岩石介质中裂纹扩展模式的影响[J].地球物理学报,2000,43(1):116-121. 被引量:69
  • 9Bruno M S.Pore pressure influence on tensile fracture propagation in sedimentary rock[J].Int J Rock Mech Min Sci & Geomech Abstr,1991,28(4):261-273. 被引量:1
  • 10David J.Computer simulation of the movement of ore and waste in an underground mining pillar[J].The Canadian Mining and Metallurgical,1968,67(2):854-859. 被引量:1

二级参考文献14

共引文献111

同被引文献84

引证文献9

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部