隧道工程施工中,由于不良地质现象、支护参数或形式不当、支护时间滞后、施工质量缺陷等原因,塌方是时有发生的。处理塌方可以引进新奥法思路,使塌方的处理达到最佳效果。文章详细介绍了新奥法思路处理塌方在不良地质隧道工程中的成功应用,并根据实际情况归纳出山东威海市昆明路隧道塌方处理技术措施。
Because the quality of soil isn't well,the shoring parameter or form is improper,the shoring time is lagged and the quality of construction has the bug,the landslide is oftentimes happened in the construction of tunnel engineering.When dipose the landslide,we can also work in the Xin-ao method thought in order that the disposal of the landslide reaches the best impact.The successful application of disposing the landslide with the Xin-ao method thought in the bad soil tunnel engineering was introduced in this paper, and based on the actual circumstances,the tunnel landslide disposal technical measures were concluded in Kunming road.