热控自动化系统设计与监控点设置 被引量:2

Thermal Power Plant Control Automation System Design and Monitoring Points Setting
下载PDF
导出
摘要 介绍了江苏华能淮阴电厂1期工程2台220 MW燃煤机组及2期工程2台330 MW燃煤机组监控点的设置,对1、2期工程监控点设置进行了分析,阐述了火力发电厂热控自动化系统设计与监控点设置的关系。根据3期工程(2台330 MW机组)项目的实施,提出了全厂监控点的设置设想,通过对热控自动化系统的优化设计,合理配置监控点,达到运行人员配置的最优化。 The paper introduced and analyzed the monitoring points setting of two 220 MW and two 330 MW coal fired generation units of Huaneng Huaiyin Power Plant constructed in phase one and phase two respectively. It explained the relationship between control automation system design and monitoring point's setting in thermal power plants, Based on it ,the setting of monitoring points of two new 330 MW units was proposed. With the optimized design on control automation system and reasonable monitoring points setup, the purpose of optimization of operating personnel arrangement can be reached.
作者 张健
机构地区 华能淮阴电厂
出处 《江苏电机工程》 2006年第2期76-78,共3页 Jiangsu Electrical Engineering
关键词 热控自动化 系统设计 监控点 thermal-control automation system design monitoring points
  • 相关文献

参考文献1

  • 1华能淮阴电厂二期工程热工自动化部分说明书[Z].西北电力设计院. 被引量:1

同被引文献12

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部