摘要
结合赛格广场大厦的场地条件,介绍了赛格广场大厦工程从施工到运营初期的变形监测情况,确定和分析了沉降监测的精度,对大厦本身及周围建筑物的沉降监测数据进行了分析,验证了地基基础设计方案及施工方案是合理的、可靠的,保证了施工的安全性。
In consideration of space condition of Saige Square Building, the deformation monitoring situation of Saige Square Building project from construction to early days of the operating was introduced, the precision of settlement monitoring was discussed, settlement monitoring data was analyzed for building itself and its building around. The design scheme and the construction scheme of ground foundation were proved reasonable and reliable, and as a result, the safety of construction was ensured.
出处
《工程建设》
2006年第1期41-45,共5页
Engineering Construction
关键词
赛格广场大厦
沉降监测
监测精度
监测成果分析
Saige Square Building
settlement monitoring
precision of monitoring
analysis of monitoring data