期刊文献+

构皮滩拱坝设计及优化 被引量:7

Arch dam layout and optimization of Goupitan hydropower station
下载PDF
导出
摘要 构皮滩拱坝坝高232.5m,坝基地质条件复杂,坝身孔口多、规模大,拱坝规模和技术难度均超出现行拱坝设计规范的控制。借鉴国内外高拱坝设计经验和最新研究成果,采用多种分析方法和模型试验,结合工程类比,对构皮滩拱坝体形、应力、坝肩稳定、抗震和基础处理等进行了研究分析,并结合工程实际施工情况,对大坝进行适当优化调整,使拱坝设计最终达到安全可靠,技术可行,经济合理。 Goupitan arch dam is 232.5 m high with multiple large orifices, the geologic condition of dam foundation is complicated. The arch dam scale and techni cal difficulty are beyond the arch dam design standard currently in effect. Using the abroad and domestic arch dam design experience and most up-to-date scienti fic research achievement for reference, adopting various analysis methods and model tests and comparing with the similar project, the researches on the arch dam configuration, stress, dam abutment stability, anti-quake and foundation treatment of Goup itan project were carried out, and in the light of concrete condition of the project, the dam is optimized properly, realizing the project design objectives of safety and reliability, technical feasibility, economic rationality.
出处 《人民长江》 北大核心 2006年第3期23-25,共3页 Yangtze River
关键词 混凝土拱坝 拱坝体形 拱坝设计 构皮滩水电站 concrete arch dam arch dam configuration arch dam design Goupitan hydropower station
  • 相关文献

同被引文献11

引证文献7

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部