期刊文献+

美国South Bermuda污水厂的升级改造 被引量:14

Upgrading Reconstruction of U.S. South Bermuda Wastewater Treatment Plant
下载PDF
导出
摘要 美国South Bermuda污水厂经过工艺升级改造,污水处理量大为增加(从3.19×104m3/d增至5×104m3/d),而新建处理设施的占地面积较小。在升级改造中采用了以在线活性污泥模型ASM2D为基础的生物工艺智能优化系统(BIOS),实现了出水达标排放和曝气节能的双重目的。 After upgrading reconstruction, the treatment capacity of U. S. South Bermuda Wastewater Treatment Plant is increased from 3.19× 10^4 m^3/d to 5×10^4 m^3/d, and the new built treatment facility has less land occupied. In upgrading reconstruction, the bio-process intelligent optimization system based on the on-line activated sludge model ASM2D is used, and thus achieving the effluent up to discharge standard and energy saving of aeration.
出处 《中国给水排水》 CAS CSCD 北大核心 2006年第4期31-33,共3页 China Water & Wastewater
关键词 污水处理厂 升级改造 活性污泥模型 生物工艺智能优化系统 wastewater treatment plant upgrading reconstruction activated sludge model bio-process intelligent optimization system
  • 相关文献

同被引文献85

引证文献14

二级引证文献81

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部