摘要
本文在预测了本世纪末我国铁矿石进口的基础上构筑了其海运网络。运用网络流模糊规划方法按最大最小费用流问题对矿石货流进行了合理安排。建立了海运船队营运的开式循环排队网络模拟模型,并运用随机离散事件系统的模拟优化方法选取了最佳船队。
A sea shipping network is constructed based on the prediction of importation of iron ore in China within this decade. Flows of iron ore imported are arranged reasonably by means of the fuzzy network flow programming method for maximum flow minimum cost problem. A simulation model for an open-ended cyclic queuing network system is established to test the operating performance of the fleet. The simulation-optimization method for stochastic discrete event system is raised on the basis of statistical hypothesis testing to select the optimal fleet.
出处
《中国造船》
EI
CSCD
北大核心
1996年第1期23-29,共7页
Shipbuilding of China
关键词
海运网络
系统模拟
模糊规划
水路运输
铁矿石
Sea shipping network, Optimization, System simulation, Fuzzy programming