摘要
DOKA爬模系统是武汉阳逻长江公路大桥北塔工程从国外引进的大型自升式模板、支架结构,从设计、组拼、工程实践等方面,介绍了DOKA爬模系统的设计特点和施工优势。对于各种不同截面型式的高塔、高墩建筑的施工,具有一定的参考价值。
The DOKA climbing formwork system presented in this paper, including its largescale self-climbing system and formwork supporting structures, was imported abroad for North Pylon Construction Project, Wuhan Yangluo Changjiang River Highway Bridge. In this paper, the design characteristics and construction advantages of the formwork system are described from aspect of design, assembling and application. The presentations of the formwork system herewith are of certain reference to the construction of high-rise pylons and piers of different sections.
出处
《桥梁建设》
EI
CSCD
北大核心
2006年第1期62-65,共4页
Bridge Construction
关键词
桥塔
爬模系统
桥梁施工
pylon
climbing formwork system
bridge construction