摘要
根据调试经验和对线路短路判別测试电路图的研究,阐述了直流牵引网线路短路判別测试与自动重合闸的配合原理。
Based on the author' s experience in adjustment test and the study on the diagram of diagnosis and detection of short - circuit, the principles of coordination between diagnosing and detecting short - circuit and automatic re - closing in D.C. traction network are described.
出处
《都市快轨交通》
2006年第1期94-96,共3页
Urban Rapid Rail Transit
关键词
直流牵引网
线路短路判别测试
自动重合闸配合
D.C. traction network
line test with distingwish short - circuit
automatic re - closing
coordination