摘要
根据下坂地工程地处海拔高、年温度变化大、冬季气候寒冷地区的特点,本文主要从沥青混凝土心墙的墙体布置形式和施工方式两方面来论述下坂地工程大坝心墙形式的选择。
Based on the features of Xiabandi Project with high altitude, great temperature variation and cold winter, the selection of seepage prevention type is carried out for the asphalt concrete core wall in consideration of collocation and construction.
出处
《西北水力发电》
2006年第1期78-79,共2页
Journal of Northwest Hydroelectric Power
关键词
防渗体
心墙
材料
布置
施工
seepage prevention wall
core wall
material
collocations construction