摘要
结合汕梅高速公路梅州至梅南段边坡防护工程实例,介绍对黑色碳质页岩高边坡在不利季节尤其是雨季施工时动态设计、动态施工的方法,采用由上至下、分级开挖、边开挖、边防护的原则,提出先排基岩裂隙水,再喷素混凝土,后进行锚杆和锚索格子梁施工的加固处治措施。工程实践结果表明,采用该方法施工效果良好。
The Meizhou to Meinan section of the Shantou--Meizhou Expressway lies in the east of Guangdong Province, which connects the northeast and southeast mountainous areas of Guangdong littoral region. Its construction is important in completing the expressway network, providing access to northeast mountainous areas, improving the investment environment, and further accelerating economy development. The route is 12.288 km long with designed speed 80 km/h, and four lanes in both directions and with whole cross section. The subgrade width is 24.5 m. In the K1+300 - K1+600 section, the cut depth of right side is more than 30 m and the left side is more than 50 m. This article is combined with the slope prevention example in this section, the methods of dynamic design and construction for with high-cut slope with carbonaceous shale in unfavorable season are presented. Because construction time is limited and rain is often heavy in summer, this section is constructed during period of light rain. Based on slope datum, preliminary slope treatment is designed. Then the nature of rock conditions, the rock flaw water increment and the directions of rock layer etc. are continually observed. As a result, the design can be adjusted in time according to new conditions. The principle of from up to down, excavation and prevention for each stage are put forward. In addition, draining of rock flaw water, spraying concrete and strengthening action of anchor-stick grid beam are adopted. In the late of 2003, this expressway was completed and slope prevention measures were adopted. K
出处
《岩石力学与工程学报》
EI
CAS
CSCD
北大核心
2006年第2期392-398,共7页
Chinese Journal of Rock Mechanics and Engineering
关键词
边坡工程
边坡防护
碳质页岩
动态设计
动态施上
锚杆(锚索)格子梁
slope engineering, slope prevention
carbonaceous shale
dynamic design
dynamic construction. anchor-sticks grid beam