期刊文献+

上山近距离压覆倾斜煤层无煤柱开采技术 被引量:1

Mining Technology without Pillar in Raise Direction of Close and Overlapping Inclined Coal Seams
下载PDF
导出
摘要 由于地质原因,铁山南煤矿212采区与214采区,在倾向方向上近距离重叠超过400m。为了在不留或少留保护煤柱的情况下,达到确保采区轨道上山不发生破坏的目的,经过综合分析、理论建模、力学计算,求出最佳参数,通过现场试验,在开采过程中,对轨道上山底板变形进行了观测,观测结果表明该技术方案可行,围岩变形量和底板下沉量均微小,巷道安全状况良好,获得了可观的经济效益。 212 Mining Area overlaps 214 Mining Area exceeding 400m in the direction of dip in Tieshan Colliery. To ensure the rail raise of the mining area not be destroyed when no pillar or a little pillar is remained, comprehensive analysis, theory modeling, and mechanics calculation are made and the optimized parameters are acquired. In mining proceeding, the floor distortion of rail raise is observed with scene test. The result shows that this technology is feasible, the distortion of surrounding rock and subsidence of floor are both minor, and that the safety condition of roadway is well and considerable economic benefit is acquired.
出处 《煤矿开采》 2006年第1期18-20,共3页 Coal Mining Technology
关键词 压煤开采 倾斜煤层 开采技术 pillar mining inclined coal seam mining techology
  • 相关文献

参考文献4

  • 1钱鸣高 刘听成.矿山压力及其控制[M].北京:煤炭工业出版社,1986.. 被引量:24
  • 2高磊.矿山岩石力学[M].北京:机械工业出版社,1999.. 被引量:4
  • 3何国清.矿山开采沉陷学[M].徐州:中国矿业大学出版社,1995.. 被引量:29
  • 4于学馥著..地下工程围岩稳定分析[M].北京:煤炭工业出版社,1983:619.

共引文献53

同被引文献8

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部