武汉销品茂商城地下室属超长超大钢筋混凝土结构,施工中采用UEA补偿收缩混凝土结构无缝设计施工和结构自防水技术,通过设置UEA膨胀加强带和UEA后浇膨胀加强带,达到了设计要求。同时缩短工期35d,节约资金约175万元,社会经济效益良好。
The basement of Wuhan Shopping Mall is a super-sized RC structure, and UEA compensating contract concrete jointless structure and self-waterproofing of the structure were adopted in the construction. By arranging UEA expansive reinforcing belt and post-poured expansive reinforcing belt, design requirement was reached. At the same time, construction period shortened by 35 days, capital was saved by RMB 1.75 million, achieving a good social and economical effect.
出处
《建筑技术》
北大核心
2006年第1期28-29,共2页
Architecture Technology
关键词
UEA补偿收缩混凝土
无缝设计施工
结构自防水
加强带
UEA compensating contract concrete
jointless design and construction
structural self-waterproof