针对绞吸式挖泥船挖深改造,提出了绞刀架、主辅定位桩、轴系加长,水下泥泵传动、设备布置、电站功率的校核等方面的技术改造方案,经实际应用达到了预期的效果。
The main technical routines of increasing the dig depth in rebuilding 1 750 m^3/h cutter suction dredger are introduced, such as lengthening the cutter ladder, shafting and work pile, driving mode of the dredge pump, equipment disposal, the power of electrical station, etc. It is shown that the rebuilding is successful.