龙羊峡水电站变压器中性点故障的分析

Analysis of Transformer Neutral Point Fault of Longyangxia Hydropower Station
下载PDF
导出
摘要 龙羊峡水电站系西北电网的主力发电厂,总装机容量128 MW,是以发电为主,兼有防洪、灌溉、防凌等综合效益的水电工程。文章结合龙羊峡水电站2#变压器中性点故障点查找的过程,对其产生的原因进行了必要的分析,同时提出今后应采取的必要的防护措施。 Longyangxia hydropower station is the main generation power plant of the Northwest electric power grid, its total installed capacity is 128MW, and it is a hydraulic power engineering which mainly has the function of generation and also possesses the integrated efficiency of flood-prevention, irrigation. Combining with the process of finding the fault point of the 2# transformer's neutral point of Longyangxia hydropower station, the paper makes an essential analysis of its reason, and puts forward the necessary defending measurement which should be adopted in the future.
作者 胡锁钢
出处 《青海电力》 2005年第4期20-22,68,共4页 Qinghai Electric Power
关键词 水电站 变压器 中性点 故障 分析 Hydropower station Transformer Neutral point Fault Analysis
  • 相关文献

参考文献3

  • 1李光琦编..电力系统暂态分析[M].北京:水利电力出版社,1985:262.
  • 2高压电气试验方法及诊断技术[M].国家电力公司. 被引量:1
  • 3陈化钢.电力设备预防性试验技术问答[M].北京:中国水利水电出版社,1997.. 被引量:12

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部