PC斜拉桥主梁应变测试技术研究

Research of Strain Measurement Techniques for Main Girders of PC Cable-Stayed Bridges
下载PDF
导出
摘要 结合PC斜拉桥结构及施工特点,提出了其主梁应力应变的测试技术和分析方法,对混凝土应变传感仪器的选择、测点布置、影响因素分析、实测值的计算与修正进行了研究,并在PC斜拉桥施工和营运中进行应用,取得良好效果。 With reference to the structure and construction features of prestressed concrete (PC) cable-stayed bridges, this paper presents the measurement techniques and analysis methods for stress and strain of main girders of the bridges, and also conducts researches in relation to the selection of strain gauges for concrete structures, strain measurement point layout, influential factor analysis, calculation and modification of field measurement values. The techniques and analysis methods herewith prove to be quite effective through their applications to the PC cablestayed bridges being constructed and/or have been put in service.
作者 丁弢 陈常松
出处 《桥梁建设》 EI CSCD 北大核心 2005年第6期79-82,共4页 Bridge Construction
关键词 斜拉桥 预应力混凝土桥 主梁 应变 测试技术 cable-stayed bridge prestressed concrete bridge main girder strain measurement technique
  • 相关文献

参考文献4

  • 1王国鼎等编著..桥梁检测与加固[M].北京:人民交通出版社,2003:217.
  • 2王卫兵 王卫锋 徐郁峰 韩大健.差动式传感器在崖门大桥应力测试中的应用[A]..中国公路学会桥梁和结构工程学会2001年桥梁学术讨论会论文集[C].北京:人民交通出版社,2001.566—570. 被引量:2
  • 3陈常松,颜东煌,程海潜,涂光亚,刘乐天.大跨度PC斜拉桥施工控制中温度效应分析[J].公路交通科技,2002,19(6):84-87. 被引量:21
  • 4《建筑材料》编写组..建筑材料 第2版[M].北京:中国建筑工业出版社,1985:205.

二级参考文献2

  • 1范立础.桥梁工程(上册)[M].北京:人民交通出版社,1986.320-327. 被引量:2
  • 2-.武汉市江汉四桥工程施工过程控制和施工监测关键技术研究课题研究报告[M].武汉:武汉市江汉四桥工程建设指挥部等单位,1999,12.45-51. 被引量:1

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部