摘要
天津地铁1号线下瓦房车站基坑工程中地下连续墙部分,由于工期的原因,安排在冬季施工。结合地下连续墙的施工特点和天津地区的实际情况,制定了冬期施工中各项质量控制措施,保证了地下连续墙冬期施工的顺利完成。
In the foundation pit works of Wafang Station of Tianjin Metro Line No. 1, the continuous wall was arranged to be constructed in winter according to the construction schedule. Taking into account the construction nature of the wall and the actual situation of Tianjin area, various quality control measures were established to guarantee the smooth construction of the wall in winter.