1huda B, Joe H M.Scheduling and control of flexible manufacturing systems: a critical review[J]Computer Integrated Manufacturing, 1994, 7(6)340~355 被引量:1
2Raviraju K.Addressing design and control issues of AGV-based FMSs with Petri net aided simulation [J].Computer Integrated Manufacturing System, 1993, 6(2): 123-134. 被引量:1
3Goyal S K,Mehta Kapil.Simulation for analysis of scheduling rules for a flexible manufacturing system [J]. Integrated Manufacturing Systems, 1995, 6(5): 21-26. 被引量:1
4Chuda Basnet, Mize J H.Scheduling and control of flexible manufacturing systems:a critical review [J]. Computer Integrated Manufacturing, 1994, 7(6): 340-355. 被引量:1