期刊文献+

沈阳市两种严重失误的道路立交设计方案 被引量:2

Design Option of Road Interchanges of Two Kinds of Serious Faults in Shenyang City
下载PDF
导出
摘要 沈阳市于1988年修建了方型广场立交,1992年修建了5座“土台子”立交,这6座立交属于两种方案,都存在严重缺憾,历经8a最长17a运营之后,终于在今年全部拆除或部分拆除。为了总结这一事件的经验教训,对这两种立交设计方案的出台和实施情况进行了回顾,提出了该立交设计方案的种种弊端和科学地决策立交设计方案的建议。 In 1988 Shenyang City has been built a square type square interchange. In 1992 it has been built five “Tutaizi” interchanges. These six interchanges belong to two kinds of options with serious fault. After operation in 8 a and the longest 17 a they were all at last removed or partially removed this year. In order to summary the experience lesson of this event the paper reviews the coming out and implementation condition of these two interchange design options and puts forward many malpractices of this interchange design option and the suggestion for scientifically deciding the interchange design option.
作者 王培阳
出处 《城市道桥与防洪》 2005年第6期89-92,共4页 Urban Roads Bridges & Flood Control
关键词 交通工程 道路立交 设计方案 沈阳市 traffic engineering, road interchange, design option, Shenyang City
  • 相关文献

参考文献2

二级参考文献2

共引文献2

同被引文献3

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部