期刊文献+

玛纳斯河一级电站引水渠沿线提取地下水进行融冰的可行性研究

Feasibility Study on Lifting Groundwater to Melt Ice Along the Diversion Canal of the Primary Power Station in Manasi River
下载PDF
导出
摘要 通过对向斜洼地含水层水文地质特征的勘探及研究,对研究区的水文地质边界条件进行了概化,并用水均衡法估算了地下水资源量,对拟建一级电站引水渠沿线提取地下水进行融冰的可行性进行了研究,并提出了取水方案。 Through exploration and research of hydro-geological characteristics of the aquifer in the synclinal low-lying land, the article generalized the hydro-geological boundary condition in this area, and estimates the volume of groundwater resources by water balance method. It also studies the feasibility for lifting groundwater to melt ice along the diversion canal of the primary power station, and puts forward the plan for lifting groundwater
作者 王春得
出处 《地下水》 2005年第5期347-349,共3页 Ground water
关键词 向斜洼地 砾岩 融冰 边界条件 水均衡 the synclinal low-lying land, conglomerate, melting ice, boundary condition, water balance
  • 相关文献

参考文献2

  • 1王英得.玛纳斯河流域山区地下水库及河谷水源地水文地质勘察报告[R].新疆兵团勘测设计院地质勘察分院,1996.. 被引量:1
  • 2周聿超.新疆流域水文水资源[Z].新疆维吾尔自治区水利厅,新疆水利学会,1999.. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部