摘要
介绍了日产三菱350MW燃煤火电机组在协调控制方式下对网频异常升高的响应过程及其动作原理,对协调方式下机组参与电网一次调频的深度进行了讨论,并且对事故后稳定机组的措施提出了可能的解决途径。
The topic mentioned contents as well as the primary network frequency control loop action theory are introduced in this article. And the suitable value for primary frequency control is discussed, and units are operated in CC mode; The measures for the unit stable operation after power network frequency abnormal is rising.
出处
《山西电力》
2005年第5期14-16,共3页
Shanxi Electric Power
关键词
电网
频率
异常
解列
network
frequency
abnormal
line off