摘要
江苏南通港闸经济开发区污水处理厂扩建工程设计规模为5万m3/d,本次实施规模为2.5万m3/d。采用水解酸化+M BBR工艺,污泥脱水采用不经消化直接脱水压滤工艺。本文介绍了各处理单元的主要设计参数和所选用设备的技术参数。
The extension project of Sewage Factory of Gangzha Economic Development zone in Nantong will be able to purify 25 000 m^3/d in scale. In the whole disposal technology,the hydrolyzea acidification and MBBR are used and it's directly dewatered and pressed without being digested. The main design parameter and equipment technology parameter are described in this paper.
出处
《佛山科学技术学院学报(自然科学版)》
CAS
2005年第3期25-28,共4页
Journal of Foshan University(Natural Science Edition)
关键词
污水处理厂
设计参数
国家标准
sewage factory
design parameter
national standard