期刊文献+

地铁大规模改造工程技术风险分析与控制 被引量:9

The Risk Analysis and Control in the Largescale Renovation of Metro
下载PDF
导出
摘要 结合北京地铁1、2号线设备消隐改造工程,综合分析和研究地铁大规模改造工程的技术风险,并提出规避技术风险的措施。 With equipment renovation in Beijing metro lines 1 and 2 as examples, the technical risks in the large - scale renovation of metro are analyzed in a comprehensive way and some counter measures are brought up.
作者 杨兴山
出处 《都市快轨交通》 2005年第5期5-8,共4页 Urban Rapid Rail Transit
  • 相关文献

参考文献3

二级参考文献11

  • 1Johnson P.Evolution of risk concept. 被引量:1
  • 2Smelley P. The Importance of comprehensive risks management programs for large projects. 被引量:1
  • 3Clark G T.Addressing risk in seattle's underground. 被引量:1
  • 4Ott K R.A Risk assessment and analysis for an existing water conveyance tunnel. 被引量:1
  • 5Rozek J.Singapore's deep tunnel sewerage system:risk management form conceptual design to construction. 被引量:1
  • 6Brenner B.Design for construction mitigation on boston's central artery/tunnel projects. 被引量:1
  • 7Stepherd A.Systems engineering applications in railways. 被引量:1
  • 8屈晓辉.秦沈客运专线主要设计技术[M].,.. 被引量:1
  • 9BellDE schlerferAJr.风险管理[M].哈佛大学,.. 被引量:1
  • 10芮光雨 王彤.项目决策分析与评价[M].北京:中国计划出版社,2003.. 被引量:7

共引文献66

同被引文献35

引证文献9

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部