输煤系统漏煤扬尘现象分析与改善措施 被引量:1

Analysis of Dust Raising from Coal Leakage and Its Countermeasures in Coal Conveying System
下载PDF
导出
摘要 缅甸TIGYIT(2×60MW)燃煤火力发电站项目是中国重型机械总公司与缅甸国家电力部缅甸电力公司签订的工程总包合同,总装机容量为120MW,包括2台240t/h锅炉,2台60MW凝汽式汽轮发电机组,一座132kV变电站以及除盐水生产,输煤、除灰系统等燃煤电站附属系统和设备。此项目是缅甸国内最大的也是唯一的燃煤火力发电厂,缅方没有任何安装和运行燃煤火力发电厂的经验,由于各种原因造成输煤系统漏煤扬尘现象严重,本人通过参与安装和试运过程,分析造成漏煤和扬尘的原因,并提出了改善措施。 TLGYIT Coal-fired Power Plant (2×60MW) is the project Contracted by China Heavy-duty Machinery Corporation from Burma Electric Power Company. Total capacity is 120 MW in the plant including 2 × 240 t/h boilers, 2 ×60 MW condensing steam turbine-generator unit, a 132kV substation and some accessory systems or equip ment such as coal conveying system and ash handling system, etc.. The project is the largest and sole coal-fired power plant in Burma. The state of dust raising from coal leakage of the conveying system was serious because the workers from Burma were lack of experience with both equipment installation and plant management. A coumtermeasuer was put forward by the writers based on the analysis of the causes of coal leakage and dust raising.
作者 王焱 徐辉
出处 《电站辅机》 2005年第3期43-47,共5页 Power Station Auxiliary Equipment
关键词 输煤系统 漏煤 扬尘 分析 改善措施 coal conveying system coal leakage dust raising analysis countermeasuer
  • 相关文献

参考文献2

  • 1.缅甸TIYGIT120MW燃煤火力发电站项目--初步设计[R].机械工业部杭州第二设计院,2001.. 被引量:1
  • 2杨伦,李莹昌编..锅炉辅机安装[M].北京:中国电力出版社,2001:487.

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部