摘要
黄埔发电厂4号机组控制系统运行情况一直不理想,影响到机组的安全运行,简要介绍了热工人员通过对原系统存在的几种常见缺陷进行的分析和研究,所提出的一套合理的改造方案付诸于实践,取得了较好的效果。
The coordination control system for unit 4 is running unsatisfactorily and affecting the safe operation of the unit. This paper briefly introduces several common defects found in original system as well as analysis and research made by I & C engineers. A practical renovation approach was proposed and put into application,good result is achieved.
出处
《华北电力技术》
CAS
2005年第9期49-51,共3页
North China Electric Power
关键词
协调控制
炉跟机
机跟炉
锅炉主控
汽机主控
coordination control
BF
TF
boiler main control
turbine main control