考虑封拱灌浆过程的高拱坝施工期仿真分析 被引量:5

Simulation analysis of high arch dam considering closure grouting during construction period
下载PDF
导出
摘要 混凝土拱坝施工过程中,结构体系的转变、坝体材料性质的变化和外荷载的变化,对拱坝应力和横缝状态具有一定的影响,为此,采用有限元方法,考虑横缝的接触非线性,模拟了分期封拱灌浆过程和提前蓄水过程,并对某高拱坝施工期温度场、应力场和灌浆前横缝开度变化作了较为全面的计算预测分析。分析认为,水管冷却过程及冬季上游蓄水时可能产生较大拉应力,值得引起注意,另外还得到了缝宽在拱圈方向的分布规律。 During construction period of arch dam, the changes of structural system, concrete materials and loads will affect the stresses and transverse joints of dam. For this reason, using the finite element method and considering the nonlinear contact of transverse joint, we simulated processes of stage-by-stage closure-arch grouting and impoundment ahead of time. Meanwhile a full calculation, prediction and analysis was made for the temperature field, stress field and transverse joint aperture of a arch dam during construction period. It is concluded that big tensile stress occurs in the process of water pipe cooling and the impoundment period in winter, which should be paid attention to. In addition, we use the distribution law of wide joints along the direction of arch ring is also gained.
作者 韩晓凤 张伟
出处 《水力发电》 北大核心 2005年第8期38-41,共4页 Water Power
关键词 高拱坝 封拱灌浆 仿真分析 横缝开度 high arch dam closure grouting simulation analysis transverse joint aperture
  • 相关文献

参考文献3

  • 1朱伯芳著..大体积混凝土温度应力与温度控制[M].北京:中国电力出版社,1999:738.
  • 2DL/T5148-2001.水工建筑物水泥灌浆施工技术规范[S].[S].,.. 被引量:112
  • 3韩晓凤..锦屏高拱坝施工期性态分析及整体安全度研究[D].广西大学,2003:

共引文献111

同被引文献37

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部