摘要
分析了矿车平硐运输系统在使用过程中存在的缺陷,提出了改造方案,并从理论上进行了验证,对放矿装置、牵引系统及电控系统等的改造进行了具体的探讨,总结了改造后的优点。
The paper analyses defect of tramcar tunnel transporting system in course of employment, offers improvement scheme and makes verification with theory. It also makes concrete discussion to renovation of draining device, tractive system and electric control system, concludes advantage after renovation.
出处
《矿山机械》
北大核心
2005年第9期44-46,共3页
Mining & Processing Equipment
基金
甘肃省科技攻关项目GS022-B52-112