摘要
The force flow cooled superconducting cable-in-conduit conductor (CICC) is used in both of EAST toroidal field (TF) and poloidal field (PF) coils. The conductor consists of multi-stage NbTi superconducting cable and 1.5 mm thick square jacket. The cable is pulled through in a thin wall circular jacket and then compacted to square cross-section conductor. The jacket material is SUS316LN austenitic stainless steel seamless tubes (about 10 m each), which is assembled by butt-welding up to 600 m. The results of the welding procedure investigation and quality assurance procedures carrying out are described in this paper.
The force flow cooled superconducting cable-in-conduit conductor (CICC) is used in both of EAST toroidal field (TF) and poloidal field (PF) coils. The conductor consists of multi-stage NbTi superconducting cable and 1.5 mm thick square jacket. The cable is pulled through in a thin wall circular jacket and then compacted to square cross-section conductor. The jacket material is SUS316LN austenitic stainless steel seamless tubes (about 10 m each), which is assembled by butt-welding up to 600 m. The results of the welding procedure investigation and quality assurance procedures carrying out are described in this paper.
基金
The project supported by the National Meg-Science Engineering Project of the Chinese Government