摘要
本文结合一工程实例,介绍了围护桩兼作地下程抗浮和外墙模板的经验,实践证明效果良好。
Based on the example of an engineering work,the experience of application of fender piles for antifloating and external wall form work of underground building was introduced. The practice shows that there were good effects gained.
出处
《地下空间》
CSCD
1996年第1期48-51,共4页
Underground Space
关键词
地下工程
围护桩
抗浮
外墙
模板
Underground engineering works, fender piles, antifloating, external wall form-work