摘要
研究了选矿厂尾矿坝筑坝问题;总结了峨口铁矿尾矿砂的应用现状和改善措施。在此基础上结合实际提出了针对该尾矿高坝安全高效运行的几点技术措施。
The concentrator damming problems are studied. The tailings applied situation and improvement of Ekou Iron Mine are summarized. On these basis and combined with reality, several technical measures for safely and highly efficient running of high dam are put forward.
出处
《中国矿山工程》
2005年第4期18-20,24,共4页
China Mine Engineering
关键词
中线法筑坝
技术分析
安全
centre-line damming
technical analysis
safety